Embarking on a home or room addition project is an exciting venture that can significantly enhance your living space. However, it’s important to understand that this process requires time and patience. Typically, a comprehensive home or room addition project can take anywhere from 20 to 30 weeks (5 to 8 months) to complete, and in some cases, it may extend beyond a year. The timeline can vary depending on the scope and complexity of your project.
If you are looking for a good Denver Room Addition Contractor, browse Colorado Builders Group’s services, we are the top choice of Denver Residents for all kinds of Home Additions.
Here’s how long it takes to complete each step involved in the home addition process:
- Discuss Your Room Addition Ideas (1-2 weeks)
- Prepare Designs, Floor Plans, And 3D Renderings (4-6 weeks)
- Acquire Permits From Authorities (2-6 weeks)
- Tackle Moisture & Water-Related Concerns (1-2 weeks)
- Demolish The Old Structure (1-2 weeks)
- Install Framing For New Walls (1-2 weeks)
- Install Lighting, Plumbing, Electrical & Mechanical Rough-in Elements (2-4 weeks)
- Install Insulation, Ceiling, & Drywall (2-3 weeks)
- Prime & Paint Walls And Other Surfaces (1-2 weeks)
- Install Flooring (1 week)
- Install Baseboards, Crown Moldings, And Other Trim Elements (1 week)
- Connect Fixtures & Set Up Appliances (1 week)
- Final Touches, Cleanup, And Inspection (1 week)
Home & Room Additions Process
1. Discuss Your Room Addition Ideas (1-2 weeks)
The first step in your home or room addition journey involves discussing your ideas with a professional contractor. During this phase, you’ll share your vision, budget, and specific requirements. Your contractor will provide valuable insights, suggest potential designs, and help you refine your concept. This collaborative process typically takes one to two weeks, allowing ample time for thorough discussions and initial planning.
2. Prepare Designs, Floor Plans, And 3D Renderings (4-6 weeks)
Once your ideas are solidified, the design phase begins. This crucial stage involves creating detailed floor plans, elevations, and 3D renderings of your proposed addition. Architects and designers work closely with you to ensure every aspect of the design aligns with your vision and complies with local building codes. This process usually takes four to six weeks, allowing for revisions and refinements to achieve the perfect design for your home.
3. Acquire Permits From Authorities (2-6 weeks)
Before any construction can begin, it’s essential to obtain the necessary permits from local authorities. This process involves submitting your plans for review and approval. The timeline for acquiring permits can vary significantly depending on your location and the complexity of your project. Generally, it takes between two to six weeks to secure all required permits. Your contractor will handle this process, ensuring all documentation is in order and following up with the relevant departments.
4. Tackle Moisture & Water-Related Concerns (1-2 weeks)
Addressing any potential moisture or water-related issues is crucial before proceeding with construction. This phase typically takes one to two weeks and involves assessing the site for drainage problems, installing waterproofing measures if necessary, and ensuring proper ventilation plans. It’s important to note that if major issues are discovered, this stage could take longer. Thorough attention to these concerns at this stage helps prevent future problems and ensures the longevity of your new addition.
5. Demolish The Old Structure (1-2 weeks)
If your addition requires removing existing structures or walls, this demolition phase usually takes one to two weeks. During this time, contractors will carefully remove the necessary elements, ensuring the structural integrity of the remaining parts of your home. This stage also involves clearing the site and preparing it for the new construction. Proper disposal of debris and recycling of materials where possible are important aspects of this phase.
6. Install Framing For New Walls (1-2 weeks)
Once the site is prepared, the framing process begins. This involves constructing the skeleton of your new addition, including walls, floors, and roof structures. Skilled carpenters will work to create a sturdy framework that adheres to your approved plans and local building codes. This phase typically takes one to two weeks, depending on the size and complexity of your addition. Proper framing is crucial as it sets the foundation for all subsequent work.
7. Install Lighting, Plumbing, Electrical & Mechanical Rough-in Elements (2-4 weeks)
With the frame in place, the next step is to install the basic systems that will bring life to your new space. This includes rough-in work for electrical wiring, plumbing pipes, HVAC ductwork, and any other mechanical systems. Licensed professionals will handle these installations, ensuring everything is up to code and positioned correctly according to your plans. This phase usually takes two to four weeks, depending on the complexity of the systems being installed.
8. Install Insulation, Ceiling, & Drywall (2-3 weeks)
Once the rough-in work is complete, it’s time to close up the walls. This stage involves installing insulation to ensure energy efficiency, followed by hanging and finishing drywall. Ceiling installation is also part of this phase. The process typically takes two to three weeks, during which your addition will start to look more like a finished space. Proper insulation and drywall installation are crucial for both comfort and energy efficiency in your new room.
9. Prime & Paint Walls And Other Surfaces (1-2 weeks)
With the drywall in place, the next step is to prime and paint the walls and other surfaces. This stage brings color and personality to your new space. Professional painters will prepare the surfaces, apply primer, and then paint according to your chosen color scheme. This process usually takes one to two weeks, depending on the size of the area and the complexity of the paint job. It’s an exciting phase as you’ll start to see your vision come to life through color.
10. Install Flooring (1 week)
Flooring installation is a crucial step in the finishing process. Whether you’ve chosen hardwood, tile, carpet, or another material, skilled professionals will install your flooring with precision. This phase typically takes about a week, though it can vary depending on the type of flooring and the size of the area. Proper installation is key to ensuring durability and a polished look in your new addition.
11. Install Baseboards, Crown Moldings, And Other Trim Elements (1 week)
Adding trim elements like baseboards, crown moldings, and door casings brings a finished look to your new space. These details can significantly enhance the overall aesthetic of your addition. Skilled carpenters will measure, cut, and install these elements with precision. This process usually takes about a week and is one of the final steps in bringing your addition to completion.
12. Connect Fixtures & Set Up Appliances (1 week)
The final interior step involves installing and connecting fixtures such as light fittings, faucets, and any built-in appliances. This is where your new addition really starts to function as a livable space. Electricians, plumbers, and other specialists will ensure everything is properly connected and functioning. This phase typically takes about a week and includes testing all systems to ensure they’re working correctly.
13. Final Touches, Cleanup, And Inspection (1 week)
The last stage of your home or room addition project involves adding final touches, conducting a thorough cleanup, and preparing for final inspections. This includes tasks like touch-up painting, caulking, and ensuring all systems are functioning perfectly. A deep clean of the new space will be conducted to remove any construction dust or debris. Finally, inspectors will review the work to ensure everything meets local building codes and standards. This phase usually takes about a week, culminating in the exciting moment when your new addition is ready for use.
It’s important to note that this timeline is a general estimate and can vary based on the specifics of your project, the efficiency of the contractors, and other variables such as weather conditions or material availability. For a more accurate timeline tailored to your specific needs and circumstances, it’s best to consult with an experienced Home Addition Contractor. If you live in Denver Metro, give Colorado Builders Group a call and we’ll help you expand your home just the way you want.